A properly executed 3-D BIM model adds value to every aspect of a construction project, including improving safety, accelerating the schedule and reducing budget. However, it is not something that can be performed by a consultant alone and then passed off to a contractor to re-model for shop drawing development and installation.
The real efficiencies are only realized when both parties start communicating and sharing information and resources very early in the process in what is referred to as a unified workflow. Unified workflow is a single process in which each functional group of a construction project participates from the onset of design to the completion of construction.
Read more about unified workflow here.
About Southland
As an MEP building systems expert, Southland Industries provides integrated, full lifecycle solutions that optimize the design, construction, operation, and efficiency of buildings. Through collaborative partnerships with our clients and the collective expertise of our people, we create premier built environments and future-ready spaces where communities and businesses can thrive.
Vice President, Marketing & Communications