Peace Health SWMC IP & Pharm

Overview

Southland provided preconstruction, prefabrication, and installation of mechanical systems for the upgrade renovation of existing mechanical and plumbing systems for the main inpatient pharmacy and administration area. 

Approach

To ensure the project was completed on time, Southland cooperated with the general contractor and the engineering team, Additionally, the initial phase work of the multi-phase project was performed during off hours to avoid disruptions. 

To isolate the space from the existing mechanical systems, exhaust fans were installed. Southland also overcame challenges when the proposed system could not be installed per plan, which required the field engineering team to make accommodations. Southland worked directly with the engineering team and the general contractor to ensure a constructable design. 

Result

Southland successfully delivered this project and maintained client satisfaction.  

One last thing before we start your download

Please complete the following form to download the White Paper. You will be opted into Southland Industries communications and can manage your preferences in the footer of any Southland Industries email.

* indicates a required field