Hyatt Centric Hotel

Overview
Southland provided design-build delivery of full mechanical and plumbing for the 220-room Hyatt Centric Hotel. The building includes a restaurant and kitchen in the lobby as well as a gym and meeting areas on the second floor.

The project included Lean installation of VRF on typical guest floor as well as prefabrication of waste, vent, and water spools. For the commissioning of 220 fan coils, Southland provided significant support troubleshooting.

Approach
Southland overcame the difficulties of scheduling compression by assisting in enhancing the schedule with innovation and prefabrication. Additionally, Southland maintained quality throughout the project process.

Result
Through team and goal alignment, Southland successfully delivered the project amid tightened deadlines and design changes.

One last thing before we start your download

Please complete the following form to download the White Paper. You will be opted into Southland Industries communications and can manage your preferences in the footer of any Southland Industries email.

* indicates a required field