Boeing: Miscellanous Projects

Overview
Southland provided general contracting services overseeing project trade contractors as well as the prefabrication and installation of all necessary mechanical systems for process vent system upgrades to an aircraft paint hanger. The paint hanger measured 100 feet tall with a footprint large enough to house a Boeing 777 jetliner.

Approach
Southland served as the prime contractor, carrying all mechanical, gas piping, controls, insulation, electrical, TAB, concrete, roofing, fire protection, and structural steel for exhaust fan stacks. Extensive pre-planning was required due to the four-week installation schedule with extremely limited access to the facility based on the client’s production schedule. The height and size of the building also required extra consideration for the placement of equipment as well as safety protocols.

Result
Southland completed structural steel upgrades, electrical, fire sprinkler, and controls work. The installation took 25 days from start to substantial completion. Overall, Southland successfully completed the project and maintained client satisfaction.

One last thing before we start your download

Please complete the following form to download the White Paper. You will be opted into Southland Industries communications and can manage your preferences in the footer of any Southland Industries email.

* indicates a required field