Media tagged with "IPD"

Nov
30

Integrated Project Delivery 2016: Panel 2

Tags: IPD, Event, Northern California

Sheraton Fisherman's Wharf
2500 Mason Street  |  San Francisco, California 94133

Southland Industries’ Henry Nutt will present ‘Leveraging IPD to Develop and Integrated Supply Chain: Streamline Manufacturing, Prefabrication, and Assembly.’ The presentation will reveal how IPD can reduce design changes and enable more detail manufacturing of prefabricated components.

Event
Nov
30

Integrated Project Delivery 2016: Panel 1

Tags: IPD, Event, Northern California

Sheraton Fisherman's Wharf
2500 Mason Street  |  San Francisco, California 94133

Southland Industries’ Henry Nutt will join a panel of industry leaders to discuss ‘Speed Learning: Hearing Mistakes Made and Lessons Learned from IPD Projects.’ The interactive session will consist of short remarks and case studies from the panel and attendees who have experienced problems of all sizes on IPD projects.

Event
Sep
26

LCI: All For One, One For All – This is How We Succeed

Tags: LCI, IPD

Hilton Chicago
Salon A1  |  Chicago, Illinois

Southland Industries’ Tony Lowe will join a panel at the Lean Construction Institute to discuss ‘All for One, One for All – This is How We Succeed.’ 

Event
Sep
26

LCI: How to Foster a Team Culture for a Successful Project

Tags: LCI, IPD

Hilton Chicago
Salon A1  |  Chicago, Illinois

Southland Industries’ Dominic Esparza will join a panel at the Lean Construction Institute to discuss ‘How to Foster a Team Culture for a Successful Project.’ 

Event
Sep
26

LCI: Lessons Learned and Best Practices

Tags: LCI, IPD

Hilton Chicago
Salon C 3/4  |  Chicago, Illinois

Southland Industries’ Danny Boh will join a panel at the Lean Construction Institute to discuss "Lessons Learned and Best Practice for User Integration During the Design Process for Successful Integrated Design and IPD Process.

Event
Apr
11

LCI Webinar: Introduction to Choosing by Advantages (CBA)

Tags: IPD, LCI

Associated Contractors of America  |  Arlington, VA
Southland Industries’ Katherine Copeland will be presenting the Choosing by Advantages method for the National Capital Region Lean Construction Institute.

Event
Apr
05

Southland Industries Awarded Desert Springs Central Utility Plant Replacement

Tags: Health Care, IPD, Southwest

Las Vegas, NV
Southland Industries, one of the nation's largest MEP building systems experts providing engineering, construction, service and energy service solutions, was recently awarded the central utility plant replacement project at Desert Springs Hospital Medical Center in Las Vegas. In addition to Southland, the integrated project delivery team consists of Berg Electric/MSA, NOVA Geotechnical, Atkins Civil, and Ed Vance Architects.

Press Release
Mar
14

Union Village: Engaging a City

Tags: Health Care, IPD

Article | Health Care Design Magazine (March 2016)
In September 2015, the blog “Union Village: Introducing a First” examined the design phase of what’s being called the largest healthcare project in the world, the Union Village health village in Henderson, Nevada.

Article
Jun
22

Integrated Project Delivery Can Work Well But Is Still No Utopia

Tags: IPD, ILPD, Construction Management

Article | ENR (June 2015)
"The risk, as far as losing money, is minimal," says Edwin Najarian, a structural engineer principal with TTG Corp. TTG's profit on IPD jobs has been "the same or a little less" than usual, he adds.

IPD proponents say the best projects combine IPD with the Lean Construction Institute's framework for minimizing waste and rework. Integrated Lean Project Delivery "is not easy, but the benefits are there if you approach ILPD the right way," says John Bennett, senior director, design and construction, of Universal Health Services Inc., an early adopter of ILPD for UHS's acute care and behavioral health hospitals.

Article
Sep
03

6 lessons from a true IPD project: George Washington University Hospital

Tags: IPD, George Washington, Hospital

Article | BDC (2014)
More and more, teamwork, trust and collaboration are seen as key to successful project delivery. Yet, few projects seek to maximize the meanings behind those words by making them central to how the project team is structured and functions.

Article