Insight

May
18
Comments
0

How Greywater Systems Do More than Minimize Water Consumption

When it comes to saving water, specifically in areas affected by droughts, reclaiming water from showers and sinks can positively benefit your facility. However, wanting to save water is not the only factor to consider when deciding if a greywater reclamation system is right for your facility.

May
12
Comments
0

Is a Greywater System Right for Your Facility, Part 1

When it comes to choosing your facility’s plumbing system, understanding if a greywater reclamation system is best for you can go a long way. A greywater system collects the drainage from showers, sinks, lavatories, cooling tower blow down, and condensate drains.

Apr
27
Comments
0

Part 2: ILPD at UHS Henderson Hospital

The UHS Henderson project is a  142 bed medical facility that spans more than 250,000 square feet.

Apr
13
Comments
0

Part 1: Sharing the Risk in ILPD

Initially trademarked by the Boldt Group, the Integrated Lean Project Delivery (ILPD) method strives to eliminate waste in construction. The process begins before design even starts. By introducing constructability efforts and lean tools early on in the project, team members can evaluate historical data and how waste can be mitigated through an integrated and collaborative design effort.

Mar
30
Comments
0

Creating Lean Initiative

Tags: Lean

Continuously implementing a strong lean culture in each division has always been a top priority for Southland. We find that our projects are more successful and our employees are safer. Although Southland’s culture has always had lean concepts embedded into it, there is always room for improvement.

Pages